tag: #fuselage (57 posts)
Show all tags- 2013-05-12 :: Control stick
- 2013-05-05 :: Rudder control pedals almost ready
- 2013-05-01 :: Front completely finished
- 2013-04-30 :: Riveting the firewall in place
- 2013-04-23 :: Piano hinge
- 2013-04-20 :: Rudder pedals
- 2013-04-14 :: Cross tubes for floor boards
- 2013-04-13 :: Walking bar done
- 2013-04-12 :: Whole bracket welded
- 2013-04-07 :: Bits
- 2013-04-06 :: Walking bar ready to be welded
- 2013-04-02 :: Still thinking about the walking bar
- 2013-04-01 :: Gusset plate for second diagonal
- 2013-03-28 :: Walking bar
- 2013-03-18 :: Last gusset plate for seat
- 2013-03-17 :: More gusset plates
- 2013-03-16 :: Cross tubes floor board support
- 2013-03-14 :: Bolts through carry through
- 2013-03-13 :: Fuel tank in position
- 2013-03-12 :: Fuel tank brackets mounted
- 2013-01-26 :: Ply and Cabane
- 2013-01-06 :: Fitting the fuel tank
- 2012-12-23 :: Family visit
- 2012-12-01 :: Carry through and dashboard
- 2012-11-27 :: Control stick
- 2012-11-18 :: How am I going to do the seat
- 2012-11-17 :: All the cross tubes
- 2012-11-11 :: Permanently joined the two halves
- 2012-11-08 :: Almost ready to bolt it together
- 2012-11-03 :: Firewall fits
- 2012-10-31 :: Marked the plywood panels
- 2012-10-28 :: Bent the side panels of fuselage
- 2012-10-27 :: Engine mount on fuselage
- 2012-10-22 :: Engine mount
- 2012-10-20 :: Finished right side
- 2012-10-16 :: Riveted 3 of the 4 diagonals
- 2012-10-14 :: Steel brackets
- 2012-10-06 :: Base of engine mount
- 2012-10-04 :: Diagonal tubes
- 2012-09-30 :: 2 Sides
- 2012-09-29 :: Foot step
- 2012-09-24 :: Left side almost done
- 2012-09-14 :: Hokitika
- 2012-09-10 :: Timber blocks and clamps
- 2012-09-09 :: Second station
- 2012-09-04 :: Start the other side
- 2012-09-02 :: Back side of fuselage
- 2012-09-01 :: Finished front section fuselage
- 2012-08-31 :: Last covered gusset plate of front section
- 2012-08-27 :: Going well
- 2012-08-26 :: Carry through gusset
- 2012-08-19 :: 2 Gusset plates
- 2012-08-18 :: New gusset plate
- 2012-08-14 :: Timber blocks on bench
- 2012-08-12 :: Timber blocks
- 2012-08-05 :: Extended workbench
- 2012-08-04 :: Big part of the project