No photos to show about the work done so far, but have done a lot of preparations.

The main landing gear frame consists of 6 tubes. Four of them are ovalized aluminium tubes with a piece of 1 " square steel pipe inside.

Drilled a lot of holes, getting everything ready for assembly. You will be impressed in the next few days, when I can show some photos !! 🙂