Here are 2 bits that need to be welded first for the "thing" that will be positioned on the two diagonal cross tubes just behind the back carry through. One bit is open so it fits over the first existing diagonal. The second diagonal slides through the second bit.

Once its welded, I need to make two more bits to support the walking bar.

img

img